Board of Supervisors: Ordinance No. 2964, increasing construction charges, fees for CSA No. 16

Print

BOARD OF SUPERVISORS, COUNTY OF LAKE, STATE OF CALIFORNIA

ORDINANCE NO. 2964

AN ORDINANCE INCREASING THE CONSTRUCTION CHARGES AND FEES

FOR COUNTY SERVICE AREA NO. 16 -- PARADISE VALLEY


The Board of Supervisors of the County of Lake ordains as follows:


Section 1: The following charges and fees for C.S.A. No. 16 are hereby approved and adopted:


1. Line Connections


a. Metered line connections:


(1) A charge of $809.75 for the installation of a water meter.


(2) A charge of $400.00 for each additional meter installed on the same property and at the same time.


(3) The cost for the installation of a water meter and tap to a main line is as follows:


(A) A charge of $1,200.00 for a five-eights by three quarter inch meter.


(B) A charge of $900.00 for a one inch meter.


(4) A charge based on the cost of material and labor shall be due for any meter or meters and taps not covered by the provisions of subdivisions (1), (2), and (3) above. Any person or entity requesting the installation of a meter or meters

pursuant to this subdivision shall deposit the amount of $1,000 with the CSA. In the event the total cost, as determined by the CSA exceeds said deposit; the deposit shall be credited to the total amount due for such costs. In the event that the total cost is less than such deposit, the difference between the deposit and the total cost shall be refunded within a reasonable amount of time of the completion of work.


2. Capacity Expansion Fee.


a. There shall be fees for any new construction or additions to existing structures and facilities in the following amount:


(1) Single family residence $13,740.00


(2) Residential construction of 720 sq. ft. or less of conditioned living space $ 6,870.00

 


b. When a specific connection type is not addressed, fees will be calculated on the flow data provided in an approved capacity analysis on the basis of 210 gallons per day per single family dwelling unit equivalent.


c. All fees and charges set forth in Section 1 and Section 2, shall be adjusted for inflation on July 1st of every year. Beginning July 1, 2012, these charges will be adjusted using the Engineering News Record – Construction Index (ENR)


Section 2: All ordinances or resolutions in conflict herewith are hereby repealed to the extent of such conflict and no further.


Section 3: This project is exempt from CEQA requirements in that it can be seen with certainty that there is no possibility that the activity in question will have a significant impact on the environment.


Section 4: This ordinance shall take effect on the 24th day of November, 2011, and before the expiration of fifteen (15) days after its passage, it shall be published at least once in a newspaper of general circulation printed and published in the County of Lake.


The foregoing Ordinance was introduced before the Board of Supervisors on the _____________ day of ________________, 2011 and passed by the following vote of the ______________ day of ________________, 2011.


AYES:


NOES:


ABSENT OR NOT VOTING:



______________________________

Chairman, Board of Supervisors


 

ATTEST: Kelly F Cox, Clerk of the Board of Supervisors

 


By:______________________________



APPROVED AS TO FORM: Anita Grant, County Counsel

 


By:________________________________