Saturday, 27 April 2024

Caltrans plans major roadwork through March 7

NORTH‌‌ ‌‌COAST, ‌‌ ‌‌Calif. — Caltrans‌‌ ‌‌reports‌‌ ‌‌that‌‌ ‌‌the‌‌ ‌‌following‌‌ ‌‌road‌‌ ‌‌projects‌‌ ‌‌will‌‌ ‌‌be‌‌ ‌‌taking‌‌ ‌‌place‌‌ ‌‌‌around‌‌ ‌‌the‌‌ ‌‌North‌‌ ‌‌Coast‌‌ ‌‌during‌‌ ‌‌the‌‌ ‌‌coming‌‌ ‌‌week. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Included‌‌ ‌‌are‌‌ ‌‌Mendocino‌‌ ‌‌County‌‌ ‌‌projects‌‌ ‌‌that‌‌ ‌‌may‌‌ ‌‌impact‌‌ ‌‌Lake‌‌ ‌‌County‌‌ ‌‌commuters, as well as work in Del Norte and Humboldt counties.
‌‌‌ ‌
Caltrans‌‌ ‌‌advises‌‌ ‌‌motorists‌‌ ‌‌to‌‌ ‌‌drive‌‌ ‌‌with‌‌ ‌‌caution‌‌ ‌‌when‌‌ ‌‌approaching‌‌ ‌‌work‌‌ ‌‌areas‌‌ ‌‌and‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌‌prepared‌‌ ‌‌to‌‌ ‌‌stop‌‌ ‌‌at‌‌ ‌‌traffic‌‌ ‌‌control‌‌ ‌‌stations. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
The‌‌ ‌‌Caltrans‌‌ ‌‌Traffic‌‌ ‌‌Operations‌‌ ‌‌Office‌‌ ‌‌has‌‌ ‌‌reviewed‌‌ ‌‌each‌‌ ‌‌project‌‌ ‌‌and‌‌ ‌‌determined‌‌ ‌‌that‌‌ ‌‌individual‌‌ ‌‌‌project‌‌ ‌‌delays‌‌ ‌‌are‌‌ ‌‌expected‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌less‌‌ ‌‌than‌‌ ‌‌the‌‌ ‌‌statewide‌‌ ‌‌policy‌‌ ‌‌maximum‌‌ ‌‌of‌‌ ‌‌30‌‌ ‌‌minutes‌‌ ‌‌unless‌‌ ‌‌‌ ‌
noted‌‌ ‌‌otherwise. ‌‌ ‌‌‌ ‌‌‌ ‌

For‌‌ ‌‌updates‌‌ ‌‌to‌‌ ‌‌this‌‌ ‌‌list‌‌ ‌‌check‌‌ ‌‌QuickMap‌‌ ‌‌at‌‌ ‌‌‌www.dot.ca.gov‌‌‌ or‌‌ ‌‌1-800-GAS-ROAD‌‌ ‌‌‌ (1-800-427-7623). ‌‌ ‌‌‌ ‌

LAKE COUNTY

Highway 175

Route 175 (8.2/16.5) – Tree work from Adams Springs Drive to Jct Route 29 will begin on Monday, March 4. One-way traffic control will be in effect from 8 a.m. to 3 p.m. Motorists should expect up to 5-minute delays. LC#P175DA

MENDOCINO COUNTY

Highway 1

Route 1 (53.2/54.6) – Electrical work south of Caspar from Sea Pines Lane to Little Lake Road will begin on Monday, March 4. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P1FA

Route 1 (75.4/76.1) – Emergency work south of Westport from the Blues Beach Trailhead to the Overlook will continue. One-way traffic control will be in effect from 7 a.m. to 6 p.m. Motorists should expect up to 5-minute delays. LC#C1TA

Route 1 (104.9/105.5) – Emergency work in Leggett from Jct Route 271 to the South Fork Eel River Bridge continues. One-way traffic control will be in effect from 7:30 a.m. to 7:00 p.m. Motorists should anticipate up to 10-minute delays. LC#C1UA

Highway 20

Route 20 (39.6/44.1) – Utility work from the Cold Creek Bridge to the Lake County Line continues. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should expect up to 5-minute delays. LC#C20OA

Highway 101

U.S. 101 (33.7/43.2) – Road work south of Willits from Route 20 to Uva Drive in Redwood Valley will continue. Lane closures will be in effect from 7 a.m. to 5 p.m. and motorists should expect minor slowdowns. LC#M101QD

Highway 128

Route 128 (18/20.1) – Electrical work will occur on Tuesday, March 5 in Philo from Nash Mill Road to Greenwood Road. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#P128AA

Highway 162

Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA

DEL NORTE COUNTY

Highway 101

U.S. 101 (8.3/8.6) – Bridge work near Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays. LC#C101KB

U.S. 101 (12.5/13.4) – Construction near Wilson Creek Road in the Last Chance Grade area will continue. A southbound lane closure will be in effect from 8 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C101OB

U.S. 101 (35.8/36.5) – Construction at the Dr. Fine Bridge near Smith River will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C101WA

Highway 199

U.S. 199 (0.8) – Work will occur near the 101 junction at Elk Valley Cross Road from 7 p.m. on Friday, March 8 to 5 a.m. on Saturday, March 9. Motorists should anticipate 5-minute delays. LC#C199IA

U.S. 199 (20/31.1) – Emergency work from east of Gasquet to the Collier Tunnel Rest Area will continue. One-way traffic is scheduled weekdays from 8 a.m. to 5 p.m. Motorists should expect up to one-hour delays. LC#C199HA

HUMBOLDT COUNTY

Highway 36

Route 36 (11/11.5) – Bridge work from Pamplin Grove to Redwood House Road will continue. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should anticipate 10-minute delays. LC#C36UA

Route 36 (25.3/25.4) – Bridge work at Little Larabee Creek will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C36UA

Route 36 (37.2/37.4) – Slipout repair near Burr Valley Road will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C36DA

Highway 96

Route 96 (27/27.6) – Construction work near Bluff Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96LA

Route 96 (29.9) – Bridge work at Slate Creek Bridge will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C96KA

Highway 101

U.S. 101 (78.3/78.7) – Road work in Eureka from C Street to J Street will continue. Lane closures will be in effect and motorists should anticipate minor traffic slowdowns. LC#C101HD

U.S. 101 (80.3/83.4) – Work at the Indianola Interchange between Eureka and Arcata is scheduled from 8 a.m. on Tuesday, March 5 to 6 a.m. on Wednesday, March 6. A southbound lane closure will be in effect. Motorists should expect minor traffic slowdowns. LC#C101FD

U.S. 101 (88.3) – Work at the 299 interchange in Arcata will continue. The northbound onramp to Route 299 will be fully closed. Motorists should use an alternative route. LC#C101KD

Highway 169

Route 169 (22.7/23.6) – Permit work near Kep’el will begin on Monday, March 4. Motorists should expect 5-minute delays from 7 a.m. to 6 p.m. weekdays. LC#P169AA

Highway 254

Route 254 (3.2/4.3) – Bridge construction near Fish Creek Road will continue. A full closure will be in effect. Motorists should use an alternate route. LC#C254CA

Route 254 (4.3/4.8) – Road work north of Fish Creek Road will continue. One-way traffic control will be in effect. Motorists should expect 5-minute delays. LC#C254DA

Route 254 (18.4/18.6) – Emergency work in Weott has begun. A full closure is in effect. Motorists should use an alternate route. LC#T254AA

Highway 255

Route 255 (2.5) – Permit work near Vane Avenue south of Manila is scheduled for Friday, March 1 from 7 a.m. to 6 p.m. Expect 5-minute delays. LC#P255CA

Highway 299

Route 299 (0/5.7) – Work from Arcata to Blue Lake will continue. Lane closures will be in effect. Motorists should anticipate minor traffic slowdowns. Off the highway on the Guintoli Lane Overcrossing, expect 5-minute nighttime delays from 8 p.m. to 7 a.m. weeknights. LC#C299HA

Route 299 (11/11.4) – Construction east of Blue Lake near North Fork Mad River Bridge 4-194 will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect 10-minute delays. LC#C299FA

Route 299 (19.1/19.8) - Work west of the Berry Summit Vista Point near Bair Road will begin. Expect 5-minute delays from 7 a.m. to 5 p.m. weekdays. LC#C299GA

Route 299 (21.5/22.2) - Emergency work west of Chezem Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C299GA

Route 299 (24.3/24.7) - Emergency work near Chezem Road will continue. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate 5-minute delays. LC#C299GA

Route 299 (32.1/32.5) - Construction work near East Fork Campground will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C299LA

Upcoming Calendar

27Apr
04.27.2024 10:00 am - 2:00 pm
Northshore Ready Fest
27Apr
04.27.2024 10:00 am - 2:00 pm
Prescription Drug Take Back Day
27Apr
04.27.2024 7:00 pm - 9:00 pm
Inaugural Team Trivia Challenge
2May
05.02.2024 5:00 pm - 8:00 pm
Neighborfest
4May
05.04.2024 2:00 pm - 4:00 pm
Park Study Club afternoon tea
5May
05.05.2024
Cinco de Mayo
6May
05.06.2024 11:00 am - 4:00 pm
Senior Summit
12May
05.12.2024
Mother's Day
27May
05.27.2024
Memorial Day

Mini Calendar

loader

LCNews

Award winning journalism on the shores of Clear Lake. 

 

Newsletter

Enter your email here to make sure you get the daily headlines.

You'll receive one daily headline email and breaking news alerts.
No spam.