Caltrans plans major roadwork through July 29

Print
NORTH‌‌ ‌‌COAST, ‌‌ ‌‌Calif.‌‌ ‌‌ — ‌ ‌Caltrans‌‌ ‌‌reports‌‌ ‌‌that‌‌ ‌‌the‌‌ ‌‌following‌‌ ‌‌road‌‌ ‌‌projects‌‌ ‌‌will‌‌ ‌‌be‌‌ ‌‌taking‌‌ ‌‌place‌‌ ‌‌‌around‌‌ ‌‌the‌‌ ‌‌North‌‌ ‌‌Coast‌‌ ‌‌during‌‌ ‌‌the‌‌ ‌‌coming‌‌ ‌‌week. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Included‌‌ ‌‌are‌‌ ‌‌Mendocino‌‌ ‌‌County‌‌ ‌‌projects‌‌ ‌‌that‌‌ ‌‌may‌‌ ‌‌impact‌‌ ‌‌Lake‌‌ ‌‌County‌‌ ‌‌commuters. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Caltrans‌‌ ‌‌advises‌‌ ‌‌motorists‌‌ ‌‌to‌‌ ‌‌drive‌‌ ‌‌with‌‌ ‌‌caution‌‌ ‌‌when‌‌ ‌‌approaching‌‌ ‌‌work‌‌ ‌‌areas‌‌ ‌‌and‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌‌prepared‌‌ ‌‌to‌‌ ‌‌stop‌‌ ‌‌at‌‌ ‌‌traffic‌‌ ‌‌control‌‌ ‌‌stations. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
The‌‌ ‌‌Caltrans‌‌ ‌‌Traffic‌‌ ‌‌Operations‌‌ ‌‌Office‌‌ ‌‌has‌‌ ‌‌reviewed‌‌ ‌‌each‌‌ ‌‌project‌‌ ‌‌and‌‌ ‌‌determined‌‌ ‌‌that‌‌ ‌‌individual‌‌ ‌‌‌project‌‌ ‌‌delays‌‌ ‌‌are‌‌ ‌‌expected‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌less‌‌ ‌‌than‌‌ ‌‌the‌‌ ‌‌statewide‌‌ ‌‌policy‌‌ ‌‌maximum‌‌ ‌‌of‌‌ ‌‌30‌‌ ‌‌minutes‌‌ ‌‌unless‌‌ ‌‌‌noted‌‌ ‌‌otherwise. ‌‌ ‌‌‌ ‌‌‌ ‌
‌‌‌ ‌
For‌‌ ‌‌updates‌‌ ‌‌to‌‌ ‌‌this‌‌ ‌‌list‌‌ ‌‌check‌‌ ‌‌QuickMap‌‌ ‌‌at‌‌ ‌‌‌www.dot.ca.gov‌‌‌ or‌‌ ‌‌1-800-GAS-ROAD‌‌ ‌‌‌ ‌(1-800-427-7623). ‌‌ ‌‌‌ ‌
‌‌‌ ‌
LAKE‌‌ ‌‌COUNTY‌‌ ‌‌‌ ‌
‌‌‌ ‌
Highway‌‌ ‌‌20

— Construction near Saratoga Spring Road will continue. One-way traffic control will be in effect from 6 a.m. to 6 p.m. weekdays. Motorists should anticipate 10-minute delays.

Highway‌‌ ‌‌29

— PG&E has been granted a Caltrans Encroachment Permit for utility work at Bar X Ranch on Thursday, July 29. One-way traffic control will be in effect from 6 a.m. to 6 p.m. Motorists should anticipate 10-minute delays.

— Construction from Spruce Grove Road to Hofacker Lane will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.

— Construction from Route 281 to Private Road will continue. One-way traffic control will be in effect overnight from 8 p.m. to 7 a.m. Motorists should anticipate 15-minute delays.

Highway‌‌ ‌‌175

— Highway construction near the Mendocino County line will begin Monday, July 26. One-way traffic control will be in effect weekdays from 7 a.m. to 5 p.m. Motorists should anticipate five-minute delays.

MENDOCINO COUNTY

Highway 20

— Slide removal two miles west of Three Chop Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays.

— PG&E has been granted a Caltrans Encroachment Permit for utility work near Two Rock Lookout on Friday, July 23. One-way traffic control will be in effect from 8 a.m. to 5 p.m. Motorists should anticipate five-minute delays.

Highway 101

— Pavement repair from Comminsky Station Road to Pieta Creek Bridge will continue. Lane closures will be in effect weekdays from 7 a.m. to 6 p.m. Motorists should anticipate minor traffic slowdowns.

— Work south of Ridgewood Ranch Road will continue. Lane closures will be in effect in both directions. Motorists should anticipate minor traffic slowdowns.

— Moss Cove Safety Rest Area will be closed through fall 2021.

— Empire Camp Safety Rest Area will be closed through fall 2021.

— PG&E has been granted a Caltrans Encroachment Permit for utility work from Cedar Creek Culvert Bridge to Route 1 on Monday, July 26. A traffic break will be in effect from 9 a.m. to 5 p.m. Motorists should anticipate five-minute delays.

— Drainage work from Piercy to the Humboldt County Line will continue. One-way traffic control will be in effect weekdays. Motorists can anticipate minor traffic slowdowns.

Highway 128

— PG&E has been granted a Caltrans Encroachment Permit for utility work from Mountain View Road to Hutsell Road on Friday, July 23. One-way traffic control will be in effect. Motorists should anticipate five-minute delays.

— PG&E has been granted a Caltrans Encroachment Permit for utility work near Robinson Creek on Friday, July 30. One-way traffic control will be in effect from 9 a.m. to 5 p.m.

Highway 175

— Pavement work near Buckman Drive will begin on Wednesday, July 28. One-way traffic control will be in effect on Wednesday, July 28, and Thursday, July 29, from 7 a.m. to 4 p.m. Motorists should anticipate five-minute delays.

— Shoulder work near Buckman Drive will begin Sunday, July 25. One-way traffic control will be in effect from 6 a.m. to 8 p.m. Motorists should anticipate 10-minute delays.

Highway 271

— PG&E has been granted a Caltrans Encroachment Permit for utility work on Monday, July 26. One-way traffic control will be in effect from 9 a.m. to 5 p.m. Motorists should anticipate five-minute delays.

— Drainage work from Old Route 101 to South Fork Eel River will continue. One-way traffic control will be in effect weekdays from 7 a.m. to 5:30 p.m. Motorists should anticipate 5-minute delays.