Caltrans plans major roadwork through Sept. 28

Print
NORTH‌‌ ‌‌COAST, ‌‌ ‌‌Calif. — Caltrans‌‌ ‌‌reports‌‌ ‌‌that‌‌ ‌‌the‌‌ ‌‌following‌‌ ‌‌road‌‌ ‌‌projects‌‌ ‌‌will‌‌ ‌‌be‌‌ ‌‌taking‌‌ ‌‌place‌‌ ‌‌‌ ‌ around‌‌ ‌‌the‌‌ ‌‌North‌‌ ‌‌Coast‌‌ ‌‌during‌‌ ‌‌the‌‌ ‌‌coming‌‌ ‌‌week. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
Included‌‌ ‌‌are‌‌ ‌‌Mendocino‌‌ ‌‌County‌‌ ‌‌projects‌‌ ‌‌that‌‌ ‌‌may‌‌ ‌‌impact‌‌ ‌‌Lake‌‌ ‌‌County‌‌ ‌‌commuters, as well as work in Del Norte and Humboldt counties.
‌‌‌ ‌
Caltrans‌‌ ‌‌advises‌‌ ‌‌motorists‌‌ ‌‌to‌‌ ‌‌drive‌‌ ‌‌with‌‌ ‌‌caution‌‌ ‌‌when‌‌ ‌‌approaching‌‌ ‌‌work‌‌ ‌‌areas‌‌ ‌‌and‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌‌prepared‌‌ ‌‌to‌‌ ‌‌stop‌‌ ‌‌at‌‌ ‌‌traffic‌‌ ‌‌control‌‌ ‌‌stations. ‌‌ ‌‌‌ ‌
‌‌‌ ‌
The‌‌ ‌‌Caltrans‌‌ ‌‌Traffic‌‌ ‌‌Operations‌‌ ‌‌Office‌‌ ‌‌has‌‌ ‌‌reviewed‌‌ ‌‌each‌‌ ‌‌project‌‌ ‌‌and‌‌ ‌‌determined‌‌ ‌‌that‌‌ ‌‌individual‌‌ ‌‌‌project‌‌ ‌‌delays‌‌ ‌‌are‌‌ ‌‌expected‌‌ ‌‌to‌‌ ‌‌be‌‌ ‌‌less‌‌ ‌‌than‌‌ ‌‌the‌‌ ‌‌statewide‌‌ ‌‌policy‌‌ ‌‌maximum‌‌ ‌‌of‌‌ ‌‌30‌‌ ‌‌minutes‌‌ ‌‌unless‌‌ ‌‌‌noted‌‌ ‌‌otherwise. ‌‌ ‌‌‌ ‌‌‌ ‌

For‌‌ ‌‌updates‌‌ ‌‌to‌‌ ‌‌this‌‌ ‌‌list‌‌ ‌‌check‌‌ ‌‌QuickMap‌‌ ‌‌at‌‌ ‌‌‌www.dot.ca.gov‌‌‌ or‌‌ ‌‌1-800-GAS-ROAD‌‌ ‌‌‌(1-800-427-7623). ‌‌ ‌‌‌ ‌

LAKE COUNTY

Highway 29

Route 29 (10.4/12.6) – Utility work in Upper Lake from Upper Lake Lucerne Road to Hammond Avenue will occur on Monday, September 25. One-way traffic control will be in effect from 8:00 a.m. to 4:30 p.m. Motorists should expect up to 5-minute delays. LC#P29BA

Highway 175

Route 175 (19.5) – Bridge work in Cobb at Bottle Rock Road will continue. One-way traffic control will be in effect from 6 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C175RA

MENDOCINO COUNTY

Highway 1

Route 1 (59.6/62) – Road work in Fort Bragg from Hare Creek to Manzanita Avenue will begin on Sunday, September 24. One-way traffic control will be in effect from 7:00 p.m. to 5:30 a.m. Motorists should anticipate up to 10-minute delays. LC#C1PA

Route 1 (62/62.2) – Bridge work in Fort Bragg from Manzanita Street to Pudding Creek Road will continue. One-way traffic control will be in effect from 7 a.m. to 4 p.m. Motorists can expect up to 5-minute delays. LC#C1OB

Route 1 (63/63.8) – Utility work in Fort Bragg south of Happy Lane continues. One-way traffic control will be in effect from 8 a.m. to 4 p.m. Motorists should expect up to 5-minute delays. LC#P1AA

Route 1 (65/65.9) – Road work in Fort Bragg at Mill Creek Drive will conclude on Saturday, September 23. One-way traffic control will be in effect from 7 a.m. to 3 p.m. Motorists should anticipate up to 10-minute delays. LC#C10A

Highway 20

Route 20 (2.2/5.4) – Paving work east of Fort Bragg from Gravel Pit Road to Private Road will occur on Friday, September 22. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C20IA

Route 20 (5.4/14.1) – Paving work east of Fort Bragg from Private Road to Road 310 will occur on Monday and Tuesday, September 25-26. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C20IA

Route 20 (7/13) – Culvert work from west of Camp One Access Road to east of Parlin Fork Camp Road will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C20JA

Route 20 (13/17.2) – Tree work west of Road 310 to Road 200A continues. One-way traffic control will be in effect from 7:00 a.m. to 4:30 p.m. Motorists should expect up to 5-minute delays. LC#C20BA

Route 20 (14.1/17.2) – Road work from Road 310 to Road 200A will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 10-minute delays. LC#C20IA

Route 20 (20/24) – Tree work at James Creek continues. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should expect up to 5-minute delays. LC#C20BA

Route 20 (32.8) – Bridge work in Willits at the Broaddus Creek Bridge continues. One-way traffic control will be in effect from 7 p.m. to 6 a.m. Motorists should anticipate up to 10-minute delays. LC#C20HA

Route 20 (34.1/38.5) – Road work from east of Road 144 to Road 260 will continue. Lane closures will be in effect from 8 p.m. to 7 a.m. and motorists should expect minor slowdowns in the area. LC#C20NA

Route 20 (37.9) – Bridge work at the Cold Creek Bridge continues. Lane closures will be in effect from 7 p.m. to 6 a.m. and motorists should expect minor slowdowns in the area. A full on ramp closure will also be in effect. LC#C20HA

Highway 101

U.S. 101 (.6/2.4) – Road work from Comminsky Station Viaduct to Geysers Road continues. One-way traffic control will be in effect and motorists should anticipate up to 10-minute delays. LC#C101NB

U.S. 101 (.6/3) – Emergency culvert work from Geysers Road to Comminsky Station Road continues. Lane closures will be in effect from 7 a.m. to 6 p.m. and motorists should expect minor slowdowns. LC#C101GB

U.S. 101 (3/5.9) – Road work from Comminsky Station Road to the Pieta Creek Bridge continues. Lane closures will be in effect from 6:30 a.m. to 5:00 p.m. and motorists should expect minor slowdowns. LC#C101KC

U.S. 101 (5.9) – Bridge work at the Pieta Creek Bridge will continue. Lane closures will be in effect from 7 p.m. to 6 a.m. and motorists should expect minor slowdowns. LC#C101WD

U.S. 101 (10.6) – Bridge work in Hopland at Feliz Creek continues. One-way traffic control closures will be in effect from 7 p.m. to 7 a.m. Motorists should anticipate up to 10-minute delays. LC#C101WD

U.S. 101 (22.1) – Bridge work at the South Ukiah Overhead continues. One-way traffic control closures will be in effect from 7 p.m. to 6 a.m. and motorists should expect minor slowdowns in the area. LC#C101WD

U.S. 101 (31.8) – Bridge work at the Forsythe Creek Bridge will continue. Lane closures will be in effect from 7 p.m. to 6 a.m. and motorists should expect minor slowdowns in the area. LC#C101WD

U.S. 101 (33.7/43.2) – Road work south of Willits from Route 20 to Uva Drive in Redwood Valley will continue. Lane closures will be in effect and motorists should expect minor slowdowns. LC#M101Q

U.S. 101 (86/87.6) – Culvert work at the Hermitage Vista Point continues. One-way traffic control will be in effect from 7 a.m. to 5 p.m. Motorists should anticipate up to 10-minute delays. LC#C101RD

U.S. 101 (100.1/103.8) – Paving work in Piercy from the Elizabeth Jane Rosewarne Memorial Bridge to the Standley Creek Undercrossing will occur on Tuesday and Wednesday, September 26-27. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 15-minute delays. LC#P101BE

U.S. 101 (102.3/104.5) – Sign work in Piercy from south of Route 271 to south of the Standley Creek Undercrossing. Lane closures will be in effect from 7 a.m. to 5 p.m. Motorists should expect minor slowdowns in the area. LC#C101YD

U.S. 101 (103.8/106.2) – Culvert work from Route 271 to south of the Lowell Allen Memorial Bridge will continue. Lane closures will be in effect from 7 a.m. to 7 p.m. and motorists should expect up to 10-minute delays. LC#C101ED

U.S. 101 (106.2/.8) – Bridge work from the Lowell Allen Memorial Bridge to Route 271 continues. Lane closures will be in effect and motorists can expect minor slowdowns in the area. LC#C101JD

Highway 162

Route 162 (11/12.6) – Road work south of Dos Rios near the Rodeo Creek Bridge continues. One-way traffic control will be in effect from 3 p.m. to 7 a.m. weeknights. Motorists should expect up to 10-minute delays. LC#C162IA

Route 162 (16.6) – Emergency work west of Laytonville Dos Rios Road continues. One-way traffic control will be in effect from 7 p.m. to 12 a.m. weeknights. Motorists should expect up to 5-minute delays. LC#T162BA

Route 162 (28.3/29.2) – Caltrans has granted an encroachment permit in Covelo from the Grist Creek Bridge to East Lane Road on Saturday, September 23. A full lane closure will be in effect from 10:30 a.m. to 1:30 p.m. and motorists should expect up to 5-minute delays. LC#C162BA

Route 162 (29.1/30.7) – Road work in Covelo from Howard Street to Mina Street continues. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect up to 10-minute delays. LC#C162AA

Route 162 (30.7/32.9) – Culvert work in Covelo at Short Creek Road will occur on Tuesday, September 26. One-way traffic control will be in effect from 9 a.m. to 4 p.m. Motorists should anticipate up to 10-minute delays. LC#C162BA

Highway 175

Route 175 (3.9/9.8) – Culvert work east of Hopland from Buckman Drive to the Lake County Line continues. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect up to 10-minute delays. LC#C175LA

Highway 271

Route 271 (19.5/20) – Road work in Piercy continues. A full lane closure is in effect from 7 a.m. to 6 p.m. Motorists should use an alternative route. LC#C271IA

DEL NORTE COUNTY

Highway 101

U.S. 101 (8.3/8.6) – Bridge work between Peine Road and Old Hunter Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate up to 10-minute delays. LC#C101KB

U.S. 101 (14.9/15.5) – Construction in the Last Chance Grade area will continue. One-way traffic control will be in effect. Motorists should anticipate a total of up to 15-minute delays. LC#C101OC

U.S. 101 (22.7/23.9) – Emergency work south of Crescent City from Hamilton Road to Humboldt Road will continue. Southbound lane closures will be in effect and motorists should anticipate minor traffic slowdowns. LC#C101EB

Highway 199

Route 199 (19.1/33.5) – Due to fire activity, there is one-way controlled traffic east of Gasquet from Grassy Flat Campground to the Collier Tunnel. There are two full closures weekdays; the first from 8 a.m. to 11 a.m. and the second from 1 p.m. to 4 p.m. Motorists should anticipate up to one-hour delays during all open hours. LC#T199CA

Route 199 (33.5) – Due to fire activity, the Collier Tunnel Rest Area is closed. LC#T199CA

HUMBOLDT COUNTY

Highway 36

Route 36 (0.1/1.7) – Construction work from U.S. 101 to River Bar Road will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate up to 15-minute delays. LC#C36AA

Route 36 (11/11.5) – Bridge work from Pamplin Grove to Redwood House Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C36UA

Route 36 (25.3/25.4) – Bridge work at Little Larabee Creek will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C36UA

Route 36 (37.2/37.4) – Slipout repair near Burr Valley Road will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C36DA

Highway 96

Route 96 (0.2) – Bridge work at Willow Creek Bridge will conclude on Friday, September 22. One-way traffic control will be in effect. Motorists should anticipate minor traffic delays. LC#C96NA

Route 96 (27/27.6) – Construction work near Bluff Creek Road will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96LA

Route 96 (28.1/28.3) – Bridge work at Aiken Creek Bridge and Bluff Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C96KA

Highway 101

U.S. 101 (0/0.9) – Slipout repair from Route 271 to Hartsook Inn will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C101IA

U.S. 101 (27.8) – Bridge work at South Fork Eel River Bridge will continue. Lane closures will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C101CF

U.S. 101 (51.8) – Bridge work at North Scotia Undercrossing will conclude on Friday, September 22. Lane closures will be in effect overnight from 8 p.m. to 3 a.m. Motorists should anticipate minor traffic slowdowns. LC#C101MD

U.S. 101 (77.3/78.1) – Various improvements between Wabash Avenue and Commercial Street will continue. Southbound lane closures will be in effect overnight from 8 p.m. to 7 a.m. Motorists should expect minor traffic slowdowns. LC#C101HD

U.S. 101 (88.3) – Ramp work in Arcata at Route 299 will continue. A full northbound on ramp closure will be in effect and motorists should use an alternative route. LC#C101KD

U.S. 101 (90.1/100.7) – Striping work from Route 200 to Trinidad Undercrossing will continue. Moving lane closures will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate 10-minute delays. LC#C101CA

Highway 169

Route 169 (27.6) - Bridge work at Rube Creek Bridge will continue. One-way traffic control will be in effect. Motorists should anticipate minor traffic slowdowns. LC#C169AA

Highway 254

Route 254 (3.2/4.3) – Bridge work between State Park Road and Fish Creek Road will continue. A full closure of this portion of the highway will be in effect. Motorists should choose an alternate route. LC#C254CA

Route 254 (4.3/4.8) – Road work north of Fish Creek Road continues. One-way traffic control will be in effect. Motorists should expect 5-minute delays. LC#C254DA

Route 254 (40.7/41.1) - Tree work near Holms Flat Road will occur on Monday and Tuesday, September 25 and 26. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C254CA

Highway 255

Route 255 (0.1/4.9) - Pavement work from 5th Street to the Lumber Mill Entrance will begin on Monday, September 25. Motorists should anticipate 10-minute delays. LC#C255EA

Highway 299

Route 299 (4.7/7.8) – Electrical work from ‘G’ Street to ‘V’ Street will begin on Monday, September 25. One-way traffic control will be in effect. Motorists should anticipate 10-minute delays. LC#C255EA

Route 299 (1.6/5.5) - Drainage work from Mad River Bridge to Blue Lake Undercrossing will continue. One-way traffic control will be in effect from 7 a.m. to 8 p.m. Motorists should anticipate minor traffic slowdowns. LC#C299QA

Route 299 (1.8) – Full westbound and eastbound on ramp closures at Route 200 will continue. Motorists should choose an alternate route. LC#P299QA

Route 299 (2.3) – A full eastbound off ramp closure at Exit 3A to Glendale Drive from 7 a.m. to 7 p.m. will conclude on Friday, September 22. Motorists should choose an alternate route. LC#C299BA

Route 299 (7.4/11) - Drainage work east of Blue Lake will continue. One-way traffic control will be in effect from 7 a.m. to 8 p.m. Motorists should anticipate 10-minute delays. LC#C299QA

Route 299 (17.2/19.1) - Utility work between Old Highway and Bair Road will conclude on Friday, September 22. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should anticipate 10-minute delays. LC#C299BA

Route 299 (19.1/19.8) – Emergency storm damage repair work between Bair Road and Acorn Lane will continue. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should anticipate 5-minute delays. LC#C299GA

Route 299 (19.1/20.7) – Utility work between Bair Road and Chezem Road will begin on Monday, September 25. One-way traffic control will be in effect from 6 a.m. to 7 p.m. Motorists should anticipate 10-minute delays. LC#C299BA

Route 299 (24.6/26.6) - Emergency work near Chezem Road will continue. One-way traffic control will be in effect from 6 a.m. to 5 p.m. Motorists should expect 5-minute delays. LC#C299GA

Route 299 (27.4/28.4) - Utility work from Three Creek Road to Vista Point will conclude on Friday, September 22. One-way traffic control will be in effect overnight from 6 p.m. to 7 a.m. Motorists should anticipate 10-minute delays. LC#C299LA

Route 299 (27.7/29.1) - Utility work from Three Creek Road to Titlow Hill Road will begin on Sunday, September 24. One-way traffic control will be in effect from 8 p.m. to 7 a.m. Motorists should anticipate 10-minute delays. LC#C299BA

Route 299 (32.1/32.5) - Construction work near East Fork Campground will continue. One-way traffic control will be in effect. Motorists should anticipate 5-minute delays. LC#C299LA